Skip to content Skip to sidebar Skip to footer

New, fully operational buildings open at the University of Athens’ School of Health Sciences

A new, fully functional, cutting-edge building infrastructure has opened in the Goudi neighborhood of Athens, right in the centre of the National and Kapodistrian University of Athens’ School of Health Sciences. The two blocks will provide teaching and research spaces for the National and Kapodistrian University of Athens’ School of Medicine, the Department of Nursing, and the ‘Medical Degree English Program’.

LAB 7807 scaled

LAB 7561 scaled

The official opening celebration took place on Thursday, 28 November 2024. Addressing the ceremony was the Rector of the National and Kapodistrian University of Athens, Professor Gerasimos Siasos. Next came addresses from the Greek Minister of Health, Mr Adonis Georgiadis, the Dean of the School of Health Sciences, Professor Pagona Lagiou, the Chair of the School of Medicine, Professor Nikolaos Arkadopoulos, the Chair of the Department of Nursing, Professor Pavlos Myrianthefs, and the Chair of the NKUA’s Technical Council, Professor Ioannis Tigelis. Also present at the ceremony were, among others, the Vice-President of the NKUA’s Administration Council, Professor Nikos Thomaidis, the Member of the NKUA’s Administration Council, Professor Spyros Vlachopoulos, the NKUA’s Vice-Rectors, Professors Efstathios Efstathopoulos and Christos Karagiannis, the Vice-Chair of the School of Medicine, Professor Konstantinos Tsioufis, the Vice-Chair of the NKUA’s Department of Nursing, Professor Daphne Kaitelidou, the NKUA’s Executive Director, Dr Eleni Vasilopoulou, as well as numerous faculty members and students at the School of Medicine, the ‘Medical Degree English Program’, and the Department of Nursing.

LAB 7984 scaled

LAB 8073 scaled LAB 8171 scaled LAB 8209 scaled LAB 8279 scaled

Located between Mikras Asias and Papadiamantopoulou St, each building has a basement, a ground floor, and a first floor—and a total size of 1,800 sqm. Together, the buildings cover an area of 3,600 sqm. Based on an existing technical study, the University Administration intends to construct yet another building that will unite the current ones, boasting 9 floors, 5 basements, and a total size of 21,000 sqm.

LAB 7355 scaled

The 2 new buildings are fully operational and equipped with the latest facilities to accommodate offices, laboratories, lecture halls, and lecture theatres. Among the works carried out to make the buildings and their surroundings fully operational were the following: installation of a functional central air conditioning system, creation of public reception areas, creation of modern lecture halls, offices, and designated meeting spaces, interior decoration of common areas with works of art, final landscaping of the property, installation of an electronic parking control system, decoration of the surrounding area and the interior of the premises with plants, and other necessary actions.

LAB 7293 scaled LAB 8505 scaled εικόνα Viber 2024 12 02 15 31 21 201 εικόνα Viber 2024 12 02 15 31 20 643

εικόνα Viber 2024 12 02 15 31 20 143 εικόνα Viber 2024 12 02 15 31 19 550 εικόνα Viber 2024 12 02 15 31 18 900 εικόνα Viber 2024 12 02 15 31 18 016

LAB 8390 scaled LAB 8473 scaled LAB 8378 scaled LAB 8579 scaled LAB 8540 scaled LAB 8407 scaled

Photos: Dimitris Konstantinidis

UoA © 2024. All Rights Reserved

Skip to content
GR